Cartwheel BESS 2

Cartwheel BESS 2 is a 157 MW battery storage request in interconnection study in the ERCOT interconnection queue, in Hopkins County, Texas.

Queue statusIn planning
  1. PlanningQueued Jun 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
23INR0495
Grid region
ERCOT (Texas)
Developer
RWE Renewables
Connection point (POI)
Tap 345kV 1697 Sulphur Springs Switch – 2464 Cash Switch
Location
Hopkins County, Texas
Technology
Battery: 157 MW
Total requested
157 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
2 June 2022
Proposed online date
June 2028

Location

Marker shows the centre of Hopkins County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas