United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· ERCOT

Deepwater

Deepwater is a 462 MW gas request withdrawn in the ERCOT interconnection queue, in Harris County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2017 (completed)
  2. Withdrawn / abandonedApr 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
21INR0007
Grid region
ERCOT (Texas)
Developer
AES
Connection point (POI)
40450 Deepwater 345kV
Location
Harris County, Texas
Technology
Gas: 462 MW
Total requested
462 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
4 December 2017
Proposed online date
April 2021
Withdrawn
April 2020

Location

Marker shows the centre of Harris County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Harris County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem