United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Goodranch Solar

Goodranch Solar is a 200 MW solar request withdrawn in the ERCOT interconnection queue, in Borden County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2017 (completed)
  2. Withdrawn / abandonedSep 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
18INR0065
Grid region
ERCOT (Texas)
Developer
EDF Renewable Energy
Connection point (POI)
79600 Vealmoor 138kV OR 79640 Vealmoor 345kV
Location
Borden County, Texas
Technology
Solar: 200 MW
Total requested
200 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
22 June 2017
Proposed online date
September 2021
Withdrawn
September 2020

Location

Marker shows the centre of Borden County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Borden County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem