United States › Grid › Interconnection queues › Texas

OCTARY USA · INTERCONNECTION QUEUES

Interconnection queue in Texas — page 38

Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.

Requests shown2,094476.4 GW
Active in queue476.4 GW2,094 requests
Agreement signed124.6 GW606 requests
Withdrawn917184.2 GW never built

Map

Loading requests…
In studyAgreement signedUnder constructionBuiltSuspendedWithdrawn

Requests

2,094 requests · page 38 of 42
ProjectCapacityStatusLocationRegionQueuedOnline
7L Solar SLF
Solar + storage · 7L Solar, LLC
71.6 MWIn study Dimmit, TXERCOT Sep 2025target 2029
Pato Blanco Storage
Battery storage · TX BESS 4, LLC
71.3 MWIn study Fort Bend, TXERCOT May 2023target 2026
Edens Solar
Solar · Hill PV, LLC
70.4 MWIn study Hill, TXERCOT Oct 2023target 2027
Venture Hill Storage
Battery storage · KCE TX 24, LLC
70.4 MWIn study Travis, TXERCOT Feb 2021target 2026
Kildare
Solar · Galsol, LLC
70.0 MWIn study Jackson, TXERCOT Jan 2022target 2026
Creekfield Storage
Battery storage
69.0 MWPaused / redesign Fort Bend, TXERCOT Nov 2020
Blue Jay Solar II
Solar · Blue Jay Solar I, LLC
69.0 MWAgreement signed Grimes, TXERCOT Apr 2021target 2025
Onshore wind project GEN-2025-SR2, Hansford County
Onshore wind
67.2 MWIn study Hansford, TXSPP May 2025target 2028
Symank Solar
Solar · BT Symank Solar, LLC
66.6 MWIn study Bosque, TXERCOT Nov 2024target 2027
Lamar Unit 1 Repower
Gas · La Frontera Holdings, LLC
66.0 MWIn study Lamar, TXERCOT Jun 2022target 2027
Smith Lake Storage DC
Solar + storage · Smith Lake Solar
65.0 MWIn study Grimes, TXERCOT Mar 2022target 2028
Demeter Storage
Solar + storage · Demeter Solar, LLC
65.0 MWIn study Caldwell, TXERCOT Aug 2022target 2029
PRI Solar
Solar · BHER Power Resources, Inc.
63.8 MWIn study Howard, TXERCOT Jul 2025target 2027
Starling Storage
Solar + storage · Starling Storage, LLC
63.6 MWAgreement signed Gonzales, TXERCOT Jan 2021target 2027
Iron Cowboy Storage
Solar + storage · Vaquero II Storage, LLC
63.3 MWIn study San Patricio, TXERCOT Jun 2025target 2028
Angus Storage
Battery storage
63.0 MWPaused / redesign Bosque, TXERCOT Nov 2017
Little Star Solar
Solar · RWE Clean Energy Development, LLC
61.6 MWIn study Bastrop, TXERCOT Jul 2024target 2026
Beaverhead Solar SLF
Solar + storage · Beaverhead Solar, LLC
61.5 MWIn study Jim Wells, TXERCOT Aug 2024target 2027
Beaverhead Storage SLF
Solar + storage · Beaverhead Solar, LLC
61.5 MWIn study Jim Wells, TXERCOT Aug 2024target 2027
Honeycomb Solar SLF
Solar + storage · Honeycomb Solar, LLC
61.4 MWAgreement signed Bee, TXERCOT Nov 2021target 2026
Orange Grove BESS
Solar + storage · Talitha Energy Project, LLC
61.4 MWAgreement signed Jim Wells, TXERCOT Jul 2021target 2027
Centennial Solar
Solar · Centennial AD 8 LLC
61.4 MWIn study Menard, TXERCOT Jan 2024target 2029
Nymphaea Storage
Solar + storage · Nymphaea Solar, LLC
61.0 MWIn study Wichita, TXERCOT Sep 2022target 2028
Celeste Energy Storage
Battery storage
60.9 MWPaused / redesign Pecos, TXERCOT Apr 2020
Fallstone Solar SLF
Solar + storage · Fallstone Solar, LLC
60.6 MWIn study Falls, TXERCOT Dec 2024target 2028
Hondo Arroyo Solar
Solar + storage · Hondo Creek Solar, LLC
60.4 MWIn study Medina, TXERCOT Jun 2024target 2028
Bird Dog Energy Storage
Battery storage · VESI 37 LLC
60.4 MWAgreement signed Live Oak, TXERCOT Feb 2021target 2026
Borden Dino BESS
Solar + storage · Borden Dino Solar, LLC
60.3 MWIn study Borden, TXERCOT Apr 2025target 2028
Oriana BESS
Solar + storage · Oriana Solar LLC
60.3 MWAgreement signed Victoria, TXERCOT Aug 2021target 2028
Tipperary Solar
Solar · Tippsol
60.2 MWIn study Schleicher, TXERCOT Jun 2024target 2028
Stonewall Solar
Solar + storage · Stonewall PV, LLC
60.2 MWIn study Stonewall, TXERCOT May 2024target 2029
Lampe Solar
Solar · Gransolar Texas Seven LLC
60.2 MWIn study Washington, TXERCOT Aug 2021target 2027
Indigo Storage 4
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Oct 2023target 2026
Indigo Storage 2
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Sep 2023target 2026
Agate Solar
Solar
60.0 MWPaused / redesign Ellis, TXERCOT Aug 2017
Indigo Storage
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Dec 2022target 2026
HIP ESS Project
Other
60.0 MWPaused / redesign Leon, TXERCOT
Indigo Storage 3
Solar + storage · Innovative Solar 245, LLC
60.0 MWIn study Fisher, TXERCOT Nov 2023target 2026
R Massengale
Gas
58.0 MWPaused / redesign Lubbock, TXERCOT Sep 2018target 2021
Sol Marina Energy Center BESS
Solar + storage · Adapture Solar Development, LLC
57.2 MWAgreement signed Ellis, TXERCOT Oct 2023target 2027
Chatee Solar
Solar · Hecate Energy
57.0 MWPaused / redesign Pecos, TXERCOT Apr 2015target 2020
Whistle Solar
Solar · Gransolar Texas Nineteen, LLC
56.3 MWIn study Navarro, TXERCOT Nov 2021target 2028
Bynum Solar Project
Solar · Bynum Solar Project, LLC
56.0 MWAgreement signed Coryell, TXERCOT Dec 2021target 2026
Longfellow BESS I
Solar + storage · CENTURY GAS PROCESSING, LLC
55.0 MWAgreement signed Pecos, TXERCOT Nov 2022target 2026
Lubio Solar
Solar · BDPU Solar Lubio LLC
54.5 MWAgreement signed Kaufman, TXERCOT Oct 2020target 2028
Silver Hills Windpower
Onshore wind · Silver Hills Windpower, LLC
54.1 MWIn study Howard, TXERCOT Apr 2025target 2029
Donna BESS
Solar + storage · Donna Solar LLC
53.9 MWIn study Hidalgo, TXERCOT Mar 2024target 2029
Paloma Energy Center BESS
Solar + storage · Harrison Street Development, LLC
53.6 MWIn study Colorado, TXERCOT Feb 2024target 2027
Wagon Timber Storage
Solar + storage · Wagon Timber Storage, LLC
53.5 MWIn study Knox, TXERCOT Jan 2025target 2028
Fighting Jays Battery
Battery storage
53.2 MWPaused / redesign Fort Bend, TXERCOT Aug 2021
Page 38 of 42

Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)