United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas — page 38
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| 7L Solar SLF Solar + storage · 7L Solar, LLC |
71.6 MW | In study |
| Pato Blanco Storage Battery storage · TX BESS 4, LLC |
71.3 MW | In study |
| Edens Solar Solar · Hill PV, LLC |
70.4 MW | In study |
| Venture Hill Storage Battery storage · KCE TX 24, LLC |
70.4 MW | In study |
| Kildare Solar · Galsol, LLC |
70.0 MW | In study |
| Creekfield Storage Battery storage |
69.0 MW | Paused / redesign |
| Blue Jay Solar II Solar · Blue Jay Solar I, LLC |
69.0 MW | Agreement signed |
| Onshore wind project GEN-2025-SR2, Hansford County Onshore wind |
67.2 MW | In study |
| Symank Solar Solar · BT Symank Solar, LLC |
66.6 MW | In study |
| Lamar Unit 1 Repower Gas · La Frontera Holdings, LLC |
66.0 MW | In study |
| Smith Lake Storage DC Solar + storage · Smith Lake Solar |
65.0 MW | In study |
| Demeter Storage Solar + storage · Demeter Solar, LLC |
65.0 MW | In study |
| PRI Solar Solar · BHER Power Resources, Inc. |
63.8 MW | In study |
| Starling Storage Solar + storage · Starling Storage, LLC |
63.6 MW | Agreement signed |
| Iron Cowboy Storage Solar + storage · Vaquero II Storage, LLC |
63.3 MW | In study |
| Angus Storage Battery storage |
63.0 MW | Paused / redesign |
| Little Star Solar Solar · RWE Clean Energy Development, LLC |
61.6 MW | In study |
| Beaverhead Solar SLF Solar + storage · Beaverhead Solar, LLC |
61.5 MW | In study |
| Beaverhead Storage SLF Solar + storage · Beaverhead Solar, LLC |
61.5 MW | In study |
| Honeycomb Solar SLF Solar + storage · Honeycomb Solar, LLC |
61.4 MW | Agreement signed |
| Orange Grove BESS Solar + storage · Talitha Energy Project, LLC |
61.4 MW | Agreement signed |
| Centennial Solar Solar · Centennial AD 8 LLC |
61.4 MW | In study |
| Nymphaea Storage Solar + storage · Nymphaea Solar, LLC |
61.0 MW | In study |
| Celeste Energy Storage Battery storage |
60.9 MW | Paused / redesign |
| Fallstone Solar SLF Solar + storage · Fallstone Solar, LLC |
60.6 MW | In study |
| Hondo Arroyo Solar Solar + storage · Hondo Creek Solar, LLC |
60.4 MW | In study |
| Bird Dog Energy Storage Battery storage · VESI 37 LLC |
60.4 MW | Agreement signed |
| Borden Dino BESS Solar + storage · Borden Dino Solar, LLC |
60.3 MW | In study |
| Oriana BESS Solar + storage · Oriana Solar LLC |
60.3 MW | Agreement signed |
| Tipperary Solar Solar · Tippsol |
60.2 MW | In study |
| Stonewall Solar Solar + storage · Stonewall PV, LLC |
60.2 MW | In study |
| Lampe Solar Solar · Gransolar Texas Seven LLC |
60.2 MW | In study |
| Indigo Storage 4 Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| Indigo Storage 2 Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| Agate Solar Solar |
60.0 MW | Paused / redesign |
| Indigo Storage Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| HIP ESS Project Other |
60.0 MW | Paused / redesign |
| Indigo Storage 3 Solar + storage · Innovative Solar 245, LLC |
60.0 MW | In study |
| R Massengale Gas |
58.0 MW | Paused / redesign |
| Sol Marina Energy Center BESS Solar + storage · Adapture Solar Development, LLC |
57.2 MW | Agreement signed |
| Chatee Solar Solar · Hecate Energy |
57.0 MW | Paused / redesign |
| Whistle Solar Solar · Gransolar Texas Nineteen, LLC |
56.3 MW | In study |
| Bynum Solar Project Solar · Bynum Solar Project, LLC |
56.0 MW | Agreement signed |
| Longfellow BESS I Solar + storage · CENTURY GAS PROCESSING, LLC |
55.0 MW | Agreement signed |
| Lubio Solar Solar · BDPU Solar Lubio LLC |
54.5 MW | Agreement signed |
| Silver Hills Windpower Onshore wind · Silver Hills Windpower, LLC |
54.1 MW | In study |
| Donna BESS Solar + storage · Donna Solar LLC |
53.9 MW | In study |
| Paloma Energy Center BESS Solar + storage · Harrison Street Development, LLC |
53.6 MW | In study |
| Wagon Timber Storage Solar + storage · Wagon Timber Storage, LLC |
53.5 MW | In study |
| Fighting Jays Battery Battery storage |
53.2 MW | Paused / redesign |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,976 · 447.2 GW
- SPP (Southwest Power Pool)79 · 20.6 GW
- MISO (Midcontinent)27 · 6,659 MW
- West (non-ISO utilities)12 · 1,947 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)