SOLAR Β· ERCOT

Chatee Solar

Chatee Solar is a 57.0 MW solar request suspended in the ERCOT interconnection queue, in Pecos County, Texas.

Queue statusPaused / redesign
  1. PlanningQueued Apr 2015 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2020 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
16INR0101
Grid region
ERCOT (Texas)
Developer
Hecate Energy
Connection point (POI)
6641 Sun Valley 69kV
Location
Pecos County, Texas
Technology
Solar: 57.0 MW
Total requested
57.0 MW
Study phase
FIS
Queue status
Suspended
Entered queue
6 April 2015
Proposed online date
December 2020

Location

Marker shows the centre of Pecos County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Pecos County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem