United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTChatee Solar
Chatee Solar is a 57.0 MW solar request suspended in the ERCOT interconnection queue, in Pecos County, Texas.
Queue statusPaused / redesign
- PlanningQueued Apr 2015 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2020 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 16INR0101
- Grid region
- ERCOT (Texas)
- Developer
- Hecate Energy
- Connection point (POI)
- 6641 Sun Valley 69kV
- Location
- Pecos County, Texas
- Technology
- Solar: 57.0 MW
- Total requested
- 57.0 MW
- Study phase
- FIS
- Queue status
- Suspended
- Entered queue
- 6 April 2015
- Proposed online date
- December 2020
Location
Marker shows the centre of Pecos County; the queue data does not give exact sites.
Other requests in Pecos County
- Laurel Wind Energy CenterOnshore wind Β· 307 MW Β· agreement signed
- Longfellow Solar IISolar + storage Β· 207 MW Β· agreement signed
- Pecos Storage CenterWind + storage Β· 201 MW Β· agreement signed
- Longfellow Solar ISolar + storage Β· 178 MW Β· agreement signed
- Headcamp Energy Storage PlantBattery storage Β· 153 MW Β· agreement signed
- Longfellow BESS IISolar + storage Β· 106 MW Β· agreement signed
- Sherbino II BESS SLFBattery storage Β· 77.4 MW Β· agreement signed
- Longfellow BESS ISolar + storage Β· 55.0 MW Β· agreement signed
- Downtown BESSBattery storage Β· 10.0 MW Β· agreement signed
- Alamo Street BESSBattery storage Β· 10.0 MW Β· agreement signed
- Indian Mesa repowerOnshore wind Β· 9.3 MW Β· agreement signed
- Desert Sky repowerOnshore wind Β· 7.2 MW Β· agreement signed
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem