Smith Lake Storage DC

Smith Lake Storage DC is a 65.0 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Grimes County, Texas.

Queue statusIn planning
  1. PlanningQueued Mar 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Dec 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
25INR0045
Grid region
ERCOT (Texas)
Developer
Smith Lake Solar
Connection point (POI)
Tap 345kV 44645 Singleton - 44900 Zenith Ckt #99
Location
Grimes County, Texas
Technology
Battery: 65.0 MW · Battery
Total requested
65.0 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
7 March 2022
Proposed online date
December 2028

Location

Marker shows the centre of Grimes County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Grimes County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem