United States › Grid › Interconnection queues › Texas
OCTARY USA · INTERCONNECTION QUEUESInterconnection queue in Texas — page 37
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Bandana Solar SLF Solar |
86.9 MW | Paused / redesign |
| Ratcliff Solar Solar · Greenalia Solar Power Ratcliff |
85.7 MW | In study |
| HappyDogSolar Solar + storage · Rosula Solar LLC |
85.5 MW | Agreement signed |
| Payne Battlecreek Solar · Gransolar Texas Ten, LLC |
85.0 MW | Agreement signed |
| RedSun BESS Solar + storage · Gransolar Texas Twenty Two |
84.0 MW | In study |
| Lupinus Storage 1 Solar + storage · Lupinus Solar, LLC |
84.0 MW | In study |
| FLIFER Solar I Solar · FLIFER LLC |
84.0 MW | In study |
| Billie Storage Battery storage · Weslaco Storage LLC |
83.8 MW | In study |
| Galaxy I Solar Solar + storage · Galaxy Solar, LLC |
82.9 MW | In study |
| RedSun Solar Solar + storage · Gransolar Texas Twenty Two |
82.6 MW | Agreement signed |
| Harper Energy Storage Battery storage · VESI 31 LLC |
82.4 MW | In study |
| M-Bar BESS I Solar + storage · M-Bar Energy I, LLC |
82.1 MW | In study |
| Proving Ground Solar Solar + storage · Lantana Solar LLC |
82.1 MW | In study |
| Hector Solar Solar + storage · Hector Solar, LLC |
81.6 MW | In study |
| Stegall Solar Solar + storage · BT Martin Solar, LLC |
81.6 MW | In study |
| Sunbelt Solar Solar + storage · Rose Hill Solar LLC |
81.5 MW | In study |
| Blarney Solar Solar · Blarney Solar Project LLC |
81.0 MW | Agreement signed |
| Soluce Bravo Solar Solar + storage · BNPB1, LLC |
80.5 MW | In study |
| Flying Kite Solar Solar + storage · FLYING KITE SOLAR LLC |
80.4 MW | Agreement signed |
| Juniperusss Solar + storage · BLUE STONE RENEWABLE XXI LLC |
80.3 MW | In study |
| Backwater Solar Solar |
80.0 MW | Paused / redesign |
| Big Star Storage Battery storage · RWE Solar Development, LLC |
80.0 MW | Agreement signed |
| Becard Solar Solar |
80.0 MW | Paused / redesign |
| Gaia Storage Solar + storage · Gaia Solar, LLC |
78.8 MW | Agreement signed |
| Hinkell BESS Battery storage · Reveille BESS |
78.1 MW | In study |
| Naduah Solar Solar · Gransolar Texas Fifteen, LLC |
77.6 MW | In study |
| Sherbino II BESS SLF Battery storage · Phoenix Battery Storage, LLC |
77.4 MW | Agreement signed |
| Cairos Storage Solar + storage · Cairos Solar, LLC |
77.3 MW | In study |
| Dionysus Storage Solar + storage · Dionysus Solar, LLC |
77.3 MW | In study |
| Eagle Springs Solar Solar + storage · Eagle Springs Solar, LLC |
77.2 MW | Agreement signed |
| Knox County Moore Storage Battery storage · DM-KCM, LLC |
77.0 MW | In study |
| Lytton Springs BESS Solar + storage · SMT Lytton Springs LLC |
76.4 MW | In study |
| Eytcheson Ranches Solar Solar · Gransolar Texas Fourteen, LLC |
76.4 MW | In study |
| Serengeti Solar Solar · Abei Energy Green XIV LLC |
76.2 MW | In study |
| Myers Storage Solar + storage · BT Myers Solar, LLC |
76.0 MW | In study |
| Donelson Solar SLF Solar + storage · Donelson Solar |
75.4 MW | In study |
| PaleAle BESS Battery storage · Momentum Energy Storage Partners,LLC |
75.4 MW | In study |
| Lytton Springs Solar Solar + storage · SMT Lytton Springs LLC |
75.3 MW | In study |
| East Blackland Battery Storage SLF Solar + storage · DERIVA ENERGY STORAGE, LLC |
75.0 MW | In study |
| Noria Storage Battery storage |
75.0 MW | Paused / redesign |
| Solar + storage project GEN-2024-071, Cass County Solar + storage |
75.0 MW | In study |
| Proteus Vernon Solar SLF Solar + storage · Vernon Solar and Storage LLC (a Delaware LLC) |
75.0 MW | In study |
| Photo BESS 1 Solar + storage · CED Development Inc. |
75.0 MW | In study |
| French Riviera Storage Battery storage · Arana Creek Battery Storage LLC |
75.0 MW | In study |
| Valdivian Solar Solar · Abei Energy Green III LLC |
74.9 MW | In study |
| Sunbeam Solar Solar · Buckeye Midway Solar |
74.4 MW | In study |
| Owego Solar Solar · Hecate Energy |
74.0 MW | Paused / redesign |
| Umbra (Stockyard) BESS Battery storage |
73.0 MW | Paused / redesign |
| Sullivan BESS Solar + storage · Sullivan Solar LLC |
72.2 MW | In study |
| Texas Sun Solar Solar · Pigg Grounds LLC |
71.7 MW | In study |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- ERCOT (Texas)1,976 · 447.2 GW
- SPP (Southwest Power Pool)79 · 20.6 GW
- MISO (Midcontinent)27 · 6,659 MW
- West (non-ISO utilities)12 · 1,947 MW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)