Lytton Springs BESS

Lytton Springs BESS is a 76.4 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Caldwell County, Texas.

Queue statusIn planning
  1. PlanningQueued Dec 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jul 2027 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
27INR0585
Grid region
ERCOT (Texas)
Developer
SMT Lytton Springs LLC
Connection point (POI)
Lytton Springs (#9074) – Fayette Plant (#7055) 345 kV Line
Location
Caldwell County, Texas
Technology
Battery: 76.4 MW · Battery
Total requested
76.4 MW
Study phase
SS Started, FIS Started, No IA
Queue status
Active
Entered queue
2 December 2025
Proposed online date
July 2027

Location

Marker shows the centre of Caldwell County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Caldwell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem