United States › Grid › Interconnection queues › Texas

GAS · ERCOT

Big Watt Power Austin-1

Big Watt Power Austin-1 is a 449 MW gas request in interconnection study in the ERCOT interconnection queue, in Caldwell County, Texas.

Queue statusIn planning
  1. PlanningQueued Oct 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Nov 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
29INR0167
Grid region
ERCOT (Texas)
Developer
Big Watt Power Austin-1 LLC
Connection point (POI)
Tapping the 345 kV Double circuit Line: Zorn (Bus# 7042) - Lytton Springs (Bus# 9074) and Zorn (Bus# 7042) - Austrop (Bus# 7040).
Location
Caldwell County, Texas
Technology
Gas: 449 MW
Total requested
449 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
3 October 2025
Proposed online date
November 2028

Location

Marker shows the centre of Caldwell County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Caldwell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem