United States › Grid › Interconnection queues › Texas

SOLAR + STORAGE · ERCOT

Demeter Solar

Demeter Solar is a 88.0 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Caldwell County, Texas.

Queue statusIn planning
  1. PlanningQueued Aug 2022 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Jun 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
25INR0129
Grid region
ERCOT (Texas)
Developer
Demeter Solar, LLC
Connection point (POI)
Tap 138kV 7224 LULING - 7216 LOCKHART
Location
Caldwell County, Texas
Technology
Solar: 88.0 MW · Battery
Total requested
88.0 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
5 August 2022
Proposed online date
June 2029

Location

Marker shows the centre of Caldwell County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Caldwell County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem