United States › Grid › Interconnection queues › Texas
GAS · ERCOTTimmerman Power Plant Phase 2B
Timmerman Power Plant Phase 2B is a 94.2 MW gas request with a signed interconnection agreement in the ERCOT interconnection queue, in Caldwell County, Texas.
Queue statusConsented
- PlanningQueued Oct 2025 (completed)
- Consented (current stage)
- Construction (not yet reached)
- OperatingTarget Aug 2026 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 26INR0735
- Grid region
- ERCOT (Texas)
- Developer
- Lower Colorado River Authority
- Connection point (POI)
- 7041 John Dumas 345kV
- Location
- Caldwell County, Texas
- Technology
- Gas: 94.2 MW
- Total requested
- 94.2 MW
- Study phase
- SS Started, FIS Started, IA
- Queue status
- Active
- Entered queue
- 21 October 2025
- Proposed online date
- August 2026
Location
Marker shows the centre of Caldwell County; the queue data does not give exact sites.
Other requests in Caldwell County
- Timmerman Power Plant Phase 2Gas · 188 MW · agreement signed
- Caldwell County Energy CenterGas · 1,500 MW · in study
- Schneider Combined CycleGas · 880 MW · in study
- Big Watt Power Austin-1Gas · 449 MW · in study
- Metro BESSBattery storage · 207 MW · in study
- Exodus BESSBattery storage · 201 MW · in study
- Elbus BESSBattery storage · 201 MW · in study
- Demeter Storage 2Solar + storage · 138 MW · in study
- Schneider Gas RiceGas · 113 MW · in study
- Schneider Gas Rice Phase 2Gas · 113 MW · in study
- Ardesia StorageBattery storage · 100 MW · in study
- Demeter SolarSolar + storage · 88.0 MW · in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem