United States › Grid › Interconnection queues › Texas

SOLAR + STORAGE · ERCOT

Donelson Solar SLF

Donelson Solar SLF is a 75.4 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Red River County, Texas.

Queue statusIn planning
  1. PlanningQueued Mar 2025 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Oct 2028 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
27INR0292
Grid region
ERCOT (Texas)
Developer
Donelson Solar
Connection point (POI)
Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR
Location
Red River County, Texas
Technology
Solar: 75.4 MW · Battery
Total requested
75.4 MW
Study phase
SS Completed, FIS Started, No IA
Queue status
Active
Entered queue
24 March 2025
Proposed online date
October 2028

Location

Marker shows the centre of Red River County; the queue data does not give exact sites.

Power plants in Texas · Transmission lines in Texas

Other requests in Red River County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem