United States › Grid › Interconnection queues › Texas
SOLAR + STORAGE · ERCOTDonelson Solar SLF
Donelson Solar SLF is a 75.4 MW solar + storage request in interconnection study in the ERCOT interconnection queue, in Red River County, Texas.
Queue statusIn planning
- PlanningQueued Mar 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Oct 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 27INR0292
- Grid region
- ERCOT (Texas)
- Developer
- Donelson Solar
- Connection point (POI)
- Tap the 69 kV Bagwell (#1785) - Clarksville (#11784) line, ONCOR
- Location
- Red River County, Texas
- Technology
- Solar: 75.4 MW · Battery
- Total requested
- 75.4 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 24 March 2025
- Proposed online date
- October 2028
Location
Marker shows the centre of Red River County; the queue data does not give exact sites.
Other requests in Red River County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem