United States โบ Grid โบ Interconnection queues โบ Vermont
OCTARY USA ยท INTERCONNECTION QUEUESWithdrawn queue requests in Vermont
Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| Solar Solar |
196 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
180 MW | Withdrawn / abandoned |
| Combined Cycle Other |
124 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
115 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
105 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
101 MW | Withdrawn / abandoned |
| Wind Onshore wind |
85.0 MW | Withdrawn / abandoned |
| Wind Onshore wind |
73.5 MW | Withdrawn / abandoned |
| Wind Onshore wind |
60.0 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
60.0 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
53.0 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
48.0 MW | Withdrawn / abandoned |
| Gas Turbine Gas |
47.5 MW | Withdrawn / abandoned |
| Wind Project Onshore wind |
45.0 MW | Withdrawn / abandoned |
| Biomass Other |
37.0 MW | Withdrawn / abandoned |
| Wind Repower Onshore wind |
35.2 MW | Withdrawn / abandoned |
| Wind Onshore wind |
34.0 MW | Withdrawn / abandoned |
| Fair Haven Biomass Other |
33.0 MW | Withdrawn / abandoned |
| Biomass Other |
33.0 MW | Withdrawn / abandoned |
| Biomass Other |
30.0 MW | Withdrawn / abandoned |
| Biomass Other |
30.0 MW | Withdrawn / abandoned |
| Deerfield Wind Onshore wind |
30.0 MW | Withdrawn / abandoned |
| GMP Generator Replacement Gas |
29.5 MW | Withdrawn / abandoned |
| Biomass Other |
27.5 MW | Withdrawn / abandoned |
| Biomass Other |
27.5 MW | Withdrawn / abandoned |
| Solar Solar |
22.5 MW | Withdrawn / abandoned |
| Solar Solar |
20.1 MW | Withdrawn / abandoned |
| Solar Solar |
20.1 MW | Withdrawn / abandoned |
| Solar Solar |
20.1 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| solar Solar |
20.0 MW | Withdrawn / abandoned |
| Grandpas Knob Wind Onshore wind |
20.0 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| wind Onshore wind |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
20.0 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| Solar Solar |
19.9 MW | Withdrawn / abandoned |
| wind Onshore wind |
17.4 MW | Withdrawn / abandoned |
| Battery Storage Battery storage |
16.0 MW | Withdrawn / abandoned |
| Davenport Solar Solar |
15.0 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines ยท Planned power plants (EIA)