United States › Grid › Interconnection queues › Vermont

BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 16.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Chittenden County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2024 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1586
Grid region
ISO-NE (New England)
Connection point (POI)
Global Foundries 13.8 kV bus
Location
Chittenden County, Vermont
Technology
Battery: 16.0 MW
Total requested
16.0 MW
Queue status
Withdrawn
Entered queue
14 August 2024
Proposed online date
April 2026
Withdrawn
June 2025

Location

Marker shows the centre of Chittenden County; the queue data does not give exact sites.

Power plants in Vermont · Transmission lines in Vermont

Other requests in Chittenden County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem