United States › Grid › Interconnection queues › Vermont

GAS · ISO-NE

GMP Generator Replacement

GMP Generator Replacement is a 29.5 MW gas request withdrawn in the ISO-NE interconnection queue, in Chittenden County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2008 (completed)
  2. Withdrawn / abandonedOct 2012 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
274
Grid region
ISO-NE (New England)
Connection point (POI)
GMP Gorge Substation
Location
Chittenden County, Vermont
Technology
Gas: 29.5 MW · Oil
Total requested
29.5 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
7 August 2008
Proposed online date
June 2014
Withdrawn
October 2012

Location

Marker shows the centre of Chittenden County; the queue data does not give exact sites.