United States βΊ Grid βΊ Interconnection queues βΊ Vermont
OTHER Β· ISO-NECombined Cycle
Combined Cycle is a 124 MW other request withdrawn in the ISO-NE interconnection queue, in Orleans County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2005 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 133
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Newport 115 kV Substation
- Location
- Orleans County, Vermont
- Technology
- Oil: 124 MW
- Total requested
- 124 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 1 August 2005
- Proposed online date
- January 2010
Location
Marker shows the centre of Orleans County; the queue data does not give exact sites.
Other requests in Orleans County
- Kingdom Community WindOnshore wind Β· 61.5 MW Β· built
- Kingdom Community Wind Increase (see Q311)Onshore wind Β· 3.1 MW Β· built
- WindOnshore wind Β· 34.0 MW Β· withdrawn
- SolarSolar Β· 20.0 MW Β· withdrawn
- Diesel generationOther Β· 10.3 MW Β· withdrawn
- Wind ( increase in queue position 266)Onshore wind Β· 8.5 MW Β· withdrawn
- WindOnshore wind Β· 5.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem