United States βΊ Grid βΊ Interconnection queues βΊ Vermont
ONSHORE WIND Β· ISO-NEWind
Wind is a 5.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Orleans County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2015 (completed)
- Withdrawn / abandonedDec 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 536
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- GMP Line 14 between Irasburg and Lowell Substations approximately 3.6 miles from Irasburg Substation adjacent to Kidder Hill Road
- Location
- Orleans County, Vermont
- Technology
- Wind: 5.0 MW
- Total requested
- 5.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 27 February 2015
- Proposed online date
- September 2016
- Withdrawn
- December 2015
Location
Marker shows the centre of Orleans County; the queue data does not give exact sites.
Other requests in Orleans County
- Kingdom Community WindOnshore wind Β· 61.5 MW Β· built
- Kingdom Community Wind Increase (see Q311)Onshore wind Β· 3.1 MW Β· built
- Combined CycleOther Β· 124 MW Β· withdrawn
- WindOnshore wind Β· 34.0 MW Β· withdrawn
- SolarSolar Β· 20.0 MW Β· withdrawn
- Diesel generationOther Β· 10.3 MW Β· withdrawn
- Wind ( increase in queue position 266)Onshore wind Β· 8.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem