United States β€Ί Grid β€Ί Interconnection queues β€Ί Vermont

ONSHORE WIND Β· ISO-NE

Wind

Wind is a 5.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Orleans County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2015 (completed)
  2. Withdrawn / abandonedDec 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
536
Grid region
ISO-NE (New England)
Connection point (POI)
GMP Line 14 between Irasburg and Lowell Substations approximately 3.6 miles from Irasburg Substation adjacent to Kidder Hill Road
Location
Orleans County, Vermont
Technology
Wind: 5.0 MW
Total requested
5.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
27 February 2015
Proposed online date
September 2016
Withdrawn
December 2015

Location

Marker shows the centre of Orleans County; the queue data does not give exact sites.

Power plants in Vermont Β· Transmission lines in Vermont

Other requests in Orleans County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem