United States β€Ί Grid β€Ί Interconnection queues β€Ί Vermont

ONSHORE WIND Β· ISO-NE

wind

wind is a 20.0 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Franklin County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2017 (completed)
  2. Withdrawn / abandonedNov 2017 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
673
Grid region
ISO-NE (New England)
Connection point (POI)
Green Mountain Power 34.5kV TL 137 Line between North St. Albans and Sheldon Springs Substations along State Route 105 in Swanton Vermont (approximately at pole 44)
Location
Franklin County, Vermont
Technology
Wind: 20.0 MW
Total requested
20.0 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
26 July 2017
Proposed online date
December 2020
Withdrawn
November 2017

Location

Marker shows the centre of Franklin County; the queue data does not give exact sites.

Power plants in Vermont Β· Transmission lines in Vermont

Other requests in Franklin County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem