United States βΊ Grid βΊ Interconnection queues βΊ Vermont
SOLAR Β· ISO-NESolar
Solar is a 19.9 MW solar request withdrawn in the ISO-NE interconnection queue, in Franklin County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2015 (completed)
- Withdrawn / abandonedFeb 2016 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 564
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 115 kV Highgate Substation
- Location
- Franklin County, Vermont
- Technology
- Solar: 19.9 MW
- Total requested
- 19.9 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 4 September 2015
- Proposed online date
- December 2016
- Withdrawn
- February 2016
Location
Marker shows the centre of Franklin County; the queue data does not give exact sites.
Other requests in Franklin County
- Battery StorageBattery storage Β· 19.3 MW Β· in study
- VPPSA Swanton Gas Turbine #1Gas Β· 21.0 MW Β· built
- SolarSolar Β· 196 MW Β· withdrawn
- SolarSolar Β· 20.1 MW Β· withdrawn
- SolarSolar Β· 20.1 MW Β· withdrawn
- solarSolar Β· 20.0 MW Β· withdrawn
- SolarSolar Β· 20.0 MW Β· withdrawn
- SolarSolar Β· 20.0 MW Β· withdrawn
- windOnshore wind Β· 20.0 MW Β· withdrawn
- SolarSolar Β· 20.0 MW Β· withdrawn
- SolarSolar Β· 19.9 MW Β· withdrawn
- windOnshore wind Β· 17.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem