United States β€Ί Grid β€Ί Interconnection queues β€Ί Vermont

OTHER Β· ISO-NE

Biomass

Biomass is a 37.0 MW other request withdrawn in the ISO-NE interconnection queue, in Windsor County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2013 (completed)
  2. Withdrawn / abandonedFeb 2014 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
418
Grid region
ISO-NE (New England)
Connection point (POI)
GMP L97 Line
Location
Windsor County, Vermont
Technology
Oil: 37.0 MW Β· Other
Total requested
37.0 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
1 May 2013
Proposed online date
August 2015
Withdrawn
February 2014

Location

Marker shows the centre of Windsor County; the queue data does not give exact sites.

Power plants in Vermont Β· Transmission lines in Vermont

Other requests in Windsor County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem