πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Vermont

SOLAR Β· ISO-NE

solar

solar is a 20.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Windsor County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2015 (completed)
  2. Withdrawn / abandonedSep 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
559
Grid region
ISO-NE (New England)
Connection point (POI)
115 kV Coolidge substation
Location
Windsor County, Vermont
Technology
Solar: 20.0 MW
Total requested
20.0 MW
Queue status
Withdrawn
Entered queue
12 August 2015
Proposed online date
December 2016
Withdrawn
September 2015

Location

Marker shows the centre of Windsor County; the queue data does not give exact sites.

Power plants in Vermont Β· Transmission lines in Vermont

Other requests in Windsor County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem