United States βΊ Grid βΊ Interconnection queues βΊ Vermont
SOLAR Β· ISO-NEsolar
solar is a 20.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Windsor County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2015 (completed)
- Withdrawn / abandonedSep 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 559
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- 115 kV Coolidge substation
- Location
- Windsor County, Vermont
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 12 August 2015
- Proposed online date
- December 2016
- Withdrawn
- September 2015
Location
Marker shows the centre of Windsor County; the queue data does not give exact sites.
Other requests in Windsor County
- Battery StorageBattery storage Β· 19.3 MW Β· in study
- Coolidge SolarSolar Β· 19.9 MW Β· built
- Battery StorageBattery storage Β· 180 MW Β· withdrawn
- Battery StorageBattery storage Β· 115 MW Β· withdrawn
- Battery StorageBattery storage Β· 105 MW Β· withdrawn
- BiomassOther Β· 37.0 MW Β· withdrawn
- BiomassOther Β· 30.0 MW Β· withdrawn
- BiomassOther Β· 30.0 MW Β· withdrawn
- BiomassOther Β· 27.5 MW Β· withdrawn
- BiomassOther Β· 27.5 MW Β· withdrawn
- SolarSolar Β· 19.9 MW Β· withdrawn
- SolarSolar Β· 19.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem