OTHER Β· ISO-NE

Biomass

Biomass is a 27.5 MW other request withdrawn in the ISO-NE interconnection queue, in Windsor County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2006 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
144
Grid region
ISO-NE (New England)
Connection point (POI)
VELCO Coolidge Substation
Location
Windsor County, Vermont
Technology
Other: 27.5 MW
Total requested
27.5 MW
Service type
Other
Queue status
Withdrawn
Entered queue
6 February 2006
Proposed online date
April 2009

Location

Marker shows the centre of Windsor County; the queue data does not give exact sites.

Power plants in Vermont Β· Transmission lines in Vermont

Other requests in Windsor County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem