United States › Grid › Interconnection queues › Vermont
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 19.3 MW battery storage request in interconnection study in the ISO-NE interconnection queue, in Windsor County, Vermont.
Queue statusIn planning
- PlanningQueued Feb 2024 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jul 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 1495
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Direct connection to VELCO 115kV Windsor substation (43.48988, -72.40858)
- Location
- Windsor County, Vermont
- Technology
- Battery: 19.3 MW
- Total requested
- 19.3 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress (unknown study)
- Queue status
- Active
- Entered queue
- 22 February 2024
- Proposed online date
- July 2029
Location
Marker shows the centre of Windsor County; the queue data does not give exact sites.
Other requests in Windsor County
- Coolidge SolarSolar · 19.9 MW · built
- Battery StorageBattery storage · 180 MW · withdrawn
- Battery StorageBattery storage · 115 MW · withdrawn
- Battery StorageBattery storage · 105 MW · withdrawn
- BiomassOther · 37.0 MW · withdrawn
- BiomassOther · 30.0 MW · withdrawn
- BiomassOther · 30.0 MW · withdrawn
- BiomassOther · 27.5 MW · withdrawn
- BiomassOther · 27.5 MW · withdrawn
- solarSolar · 20.0 MW · withdrawn
- SolarSolar · 19.9 MW · withdrawn
- SolarSolar · 19.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem