United States βΊ Grid βΊ Interconnection queues βΊ Vermont
OTHER Β· ISO-NEBiomass
Biomass is a 27.5 MW other request withdrawn in the ISO-NE interconnection queue, in Windsor County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2006 (completed)
- Withdrawn / abandonedNov 2006 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 169
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- New Ludlow 115 kV Substation
- Location
- Windsor County, Vermont
- Technology
- Other: 27.5 MW
- Total requested
- 27.5 MW
- Service type
- Other
- Queue status
- Withdrawn
- Entered queue
- 15 August 2006
- Proposed online date
- June 2009
- Withdrawn
- November 2006
Location
Marker shows the centre of Windsor County; the queue data does not give exact sites.
Other requests in Windsor County
- Battery StorageBattery storage Β· 19.3 MW Β· in study
- Coolidge SolarSolar Β· 19.9 MW Β· built
- Battery StorageBattery storage Β· 180 MW Β· withdrawn
- Battery StorageBattery storage Β· 115 MW Β· withdrawn
- Battery StorageBattery storage Β· 105 MW Β· withdrawn
- BiomassOther Β· 37.0 MW Β· withdrawn
- BiomassOther Β· 30.0 MW Β· withdrawn
- BiomassOther Β· 30.0 MW Β· withdrawn
- BiomassOther Β· 27.5 MW Β· withdrawn
- solarSolar Β· 20.0 MW Β· withdrawn
- SolarSolar Β· 19.9 MW Β· withdrawn
- SolarSolar Β· 19.9 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem