United States › Grid › Interconnection queues › Vermont
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 180 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Windsor County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2023 (completed)
- Withdrawn / abandonedDec 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1377
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Vermont Electric Power Company, Coolidge 115 kV
- Location
- Windsor County, Vermont
- Technology
- Battery: 180 MW
- Total requested
- 180 MW
- Service type
- Network resource (NRIS)
- Study phase
- Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 3 April 2023
- Proposed online date
- April 2027
- Withdrawn
- December 2023
Location
Marker shows the centre of Windsor County; the queue data does not give exact sites.
Other requests in Windsor County
- Battery StorageBattery storage · 19.3 MW · in study
- Coolidge SolarSolar · 19.9 MW · built
- Battery StorageBattery storage · 115 MW · withdrawn
- Battery StorageBattery storage · 105 MW · withdrawn
- BiomassOther · 37.0 MW · withdrawn
- BiomassOther · 30.0 MW · withdrawn
- BiomassOther · 30.0 MW · withdrawn
- BiomassOther · 27.5 MW · withdrawn
- BiomassOther · 27.5 MW · withdrawn
- solarSolar · 20.0 MW · withdrawn
- SolarSolar · 19.9 MW · withdrawn
- SolarSolar · 19.9 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem