United States › Grid › Interconnection queues › Vermont

BATTERY STORAGE · ISO-NE

Battery Storage

Battery Storage is a 180 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Windsor County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedDec 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1377
Grid region
ISO-NE (New England)
Connection point (POI)
Vermont Electric Power Company, Coolidge 115 kV
Location
Windsor County, Vermont
Technology
Battery: 180 MW
Total requested
180 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
3 April 2023
Proposed online date
April 2027
Withdrawn
December 2023

Location

Marker shows the centre of Windsor County; the queue data does not give exact sites.

Power plants in Vermont · Transmission lines in Vermont

Other requests in Windsor County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem