United States β€Ί Grid β€Ί Interconnection queues β€Ί Vermont

OTHER Β· ISO-NE

Biomass

Biomass is a 33.0 MW other request withdrawn in the ISO-NE interconnection queue, in Bennington County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2010 (completed)
  2. Withdrawn / abandonedMar 2011 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
340
Grid region
ISO-NE (New England)
Connection point (POI)
CVPS East Pownal to Bennington 46 KV line
Location
Bennington County, Vermont
Technology
Other: 33.0 MW
Total requested
33.0 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
24 June 2010
Proposed online date
March 2013
Withdrawn
March 2011

Location

Marker shows the centre of Bennington County; the queue data does not give exact sites.

Power plants in Vermont Β· Transmission lines in Vermont

Other requests in Bennington County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem