Solar is a 19.9 MW solar request withdrawn in the ISO-NE interconnection queue, in Rutland County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2015 (completed)
  2. Withdrawn / abandonedApr 2016 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
566
Grid region
ISO-NE (New England)
Connection point (POI)
VELCO Florence Substation - 46 kV
Location
Rutland County, Vermont
Technology
Solar: 19.9 MW
Total requested
19.9 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
9 September 2015
Proposed online date
December 2016
Withdrawn
April 2016

Location

Marker shows the centre of Rutland County; the queue data does not give exact sites.