SOLAR Β· ISO-NE

Solar

Solar is a 22.5 MW solar request withdrawn in the ISO-NE interconnection queue, in Rutland County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2018 (completed)
  2. Withdrawn / abandonedMay 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
762
Grid region
ISO-NE (New England)
Connection point (POI)
POI tap of GMP Florence - S. Middlebury Jct. 46 kV line, approx. 4 miles from Florence. Site is 13 acres on Carver Street/Syndicate Road, Brandon, VT 05733
Location
Rutland County, Vermont
Technology
Solar: 22.5 MW
Total requested
22.5 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
27 April 2018
Proposed online date
August 2020
Withdrawn
May 2018

Location

Marker shows the centre of Rutland County; the queue data does not give exact sites.

Power plants in Vermont Β· Transmission lines in Vermont

Other requests in Rutland County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem