United States › Grid › Interconnection queues › Vermont
HYDRO · ISO-NEProctor Hydroelectric Station Uprate
Proctor Hydroelectric Station Uprate is a 3.2 MW hydro request built and operating in the ISO-NE interconnection queue, in Rutland County, Vermont.
Request details
- Queue ID
- 545
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- GMP Proctor Substation 46kV Circuit Breaker BB8
- Location
- Rutland County, Vermont
- Technology
- Hydro: 3.2 MW
- Total requested
- 3.2 MW
- Service type
- Network resource (NRIS)
- Study phase
- Executed
- Queue status
- Operational
- Entered queue
- 3 March 2015
- Proposed online date
- June 2015
Location
Marker shows the centre of Rutland County; the queue data does not give exact sites.
Other requests in Rutland County
- Fair Haven SolarSolar · 20.0 MW · agreement signed
- WindOnshore wind · 85.0 MW · withdrawn
- Wind ProjectOnshore wind · 60.0 MW · withdrawn
- Fair Haven BiomassOther · 33.0 MW · withdrawn
- SolarSolar · 22.5 MW · withdrawn
- Grandpas Knob WindOnshore wind · 20.0 MW · withdrawn
- SolarSolar · 20.0 MW · withdrawn
- SolarSolar · 19.9 MW · withdrawn
- Davenport SolarSolar · 15.0 MW · withdrawn
- HydroHydro · 1.3 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem