United States › Grid › Interconnection queues › Vermont
SOLAR · ISO-NEFair Haven Solar
Fair Haven Solar is a 20.0 MW solar request with a signed interconnection agreement in the ISO-NE interconnection queue, in Rutland County, Vermont.
Queue statusConsented
- PlanningQueued Aug 2017 (completed)
- ConsentedJul 2020 (current stage)
- Construction (not yet reached)
- OperatingTarget Jul 2027 (not yet reached)
- Closed (not yet reached)
Request details
- Queue ID
- 680
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- GMP 46 kV between Carver Falls and Fair Haven Tap
- Location
- Rutland County, Vermont
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Executed
- Queue status
- Active
- Entered queue
- 3 August 2017
- Agreement signed
- 15 July 2020
- Proposed online date
- July 2027
Location
Marker shows the centre of Rutland County; the queue data does not give exact sites.
Other requests in Rutland County
- Proctor Hydroelectric Station UprateHydro · 3.2 MW · built
- WindOnshore wind · 85.0 MW · withdrawn
- Wind ProjectOnshore wind · 60.0 MW · withdrawn
- Fair Haven BiomassOther · 33.0 MW · withdrawn
- SolarSolar · 22.5 MW · withdrawn
- Grandpas Knob WindOnshore wind · 20.0 MW · withdrawn
- SolarSolar · 20.0 MW · withdrawn
- SolarSolar · 19.9 MW · withdrawn
- Davenport SolarSolar · 15.0 MW · withdrawn
- HydroHydro · 1.3 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem