HYDRO Β· ISO-NE

Hydro

Hydro is a 1.3 MW hydro request withdrawn in the ISO-NE interconnection queue, in Rutland County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Nov 2014 (completed)
  2. Withdrawn / abandonedJan 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
482
Grid region
ISO-NE (New England)
Connection point (POI)
GMP Power Circuit 85G2 from Ryegate Paper Substation No. 85.
Location
Rutland County, Vermont
Technology
Hydro: 1.3 MW
Total requested
1.3 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
18 November 2014
Proposed online date
December 2014
Withdrawn
January 2015

Location

Marker shows the centre of Rutland County; the queue data does not give exact sites.

Power plants in Vermont Β· Transmission lines in Vermont

Other requests in Rutland County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem