United States βΊ Grid βΊ Interconnection queues βΊ Vermont
HYDRO Β· ISO-NEHydro
Hydro is a 1.3 MW hydro request withdrawn in the ISO-NE interconnection queue, in Rutland County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2014 (completed)
- Withdrawn / abandonedJan 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 482
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- GMP Power Circuit 85G2 from Ryegate Paper Substation No. 85.
- Location
- Rutland County, Vermont
- Technology
- Hydro: 1.3 MW
- Total requested
- 1.3 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 18 November 2014
- Proposed online date
- December 2014
- Withdrawn
- January 2015
Location
Marker shows the centre of Rutland County; the queue data does not give exact sites.
Other requests in Rutland County
- Fair Haven SolarSolar Β· 20.0 MW Β· agreement signed
- Proctor Hydroelectric Station UprateHydro Β· 3.2 MW Β· built
- WindOnshore wind Β· 85.0 MW Β· withdrawn
- Wind ProjectOnshore wind Β· 60.0 MW Β· withdrawn
- Fair Haven BiomassOther Β· 33.0 MW Β· withdrawn
- SolarSolar Β· 22.5 MW Β· withdrawn
- Grandpas Knob WindOnshore wind Β· 20.0 MW Β· withdrawn
- SolarSolar Β· 20.0 MW Β· withdrawn
- SolarSolar Β· 19.9 MW Β· withdrawn
- Davenport SolarSolar Β· 15.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem