Wind Repower

Wind Repower is a 35.2 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Caledonia County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2023 (completed)
  2. Withdrawn / abandonedOct 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
1464
Grid region
ISO-NE (New England)
Connection point (POI)
VELCO, 115kV, Sheffield Substation 44.663509, -72.123160
Location
Caledonia County, Vermont
Technology
Wind: 35.2 MW
Total requested
35.2 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
5 December 2023
Proposed online date
December 2026
Withdrawn
October 2025

Location

Marker shows the centre of Caledonia County; the queue data does not give exact sites.