Wind is a 73.5 MW onshore wind request withdrawn in the ISO-NE interconnection queue, in Windham County, Vermont.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2014 (completed)
  2. Withdrawn / abandonedOct 2015 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
488
Grid region
ISO-NE (New England)
Connection point (POI)
VELCO Coolidge - Vermont Yankee 345 kV line
Location
Windham County, Vermont
Technology
Wind: 73.5 MW
Total requested
73.5 MW
Service type
Network resource (NRIS)
Study phase
System Impact Study
Queue status
Withdrawn
Entered queue
22 December 2014
Proposed online date
December 2019
Withdrawn
October 2015

Location

Marker shows the centre of Windham County; the queue data does not give exact sites.

Power plants in Vermont Β· Transmission lines in Vermont

Other requests in Windham County