United States βΊ Grid βΊ Interconnection queues βΊ Vermont
SOLAR Β· ISO-NESolar
Solar is a 20.0 MW solar request withdrawn in the ISO-NE interconnection queue, in Windham County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2017 (completed)
- Withdrawn / abandonedSep 2020 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 660
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- National Grid line tap 69 kV transmission line (D-4), feeding the Vernon Station No. 13
- Location
- Windham County, Vermont
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- In Progress
- Queue status
- Withdrawn
- Entered queue
- 20 July 2017
- Proposed online date
- July 2022
- Withdrawn
- September 2020
Location
Marker shows the centre of Windham County; the queue data does not give exact sites.
Other requests in Windham County
- VT Yankee Nuclear Power Station Upgrade7Nuclear Β· 642 MW Β· built
- Vernon RepoweringHydro Β· 32.0 MW Β· built
- Vernon Station Incremental Capacity IncreaseHydro Β· 2.9 MW Β· built
- Battery StorageBattery storage Β· 101 MW Β· withdrawn
- WindOnshore wind Β· 73.5 MW Β· withdrawn
- Wind ProjectOnshore wind Β· 48.0 MW Β· withdrawn
- SolarSolar Β· 8.1 MW Β· withdrawn
- SolarSolar Β· 2.2 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem