United States › Grid › Interconnection queues › Vermont
BATTERY STORAGE · ISO-NEBattery Storage
Battery Storage is a 20.0 MW battery storage request withdrawn in the ISO-NE interconnection queue, in Addison County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2021 (completed)
- Withdrawn / abandonedJun 2021 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1122
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- VELCO Middlebury Substation @ 46kV bus
- Location
- Addison County, Vermont
- Technology
- Battery: 20.0 MW
- Total requested
- 20.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 19 April 2021
- Proposed online date
- December 2022
- Withdrawn
- June 2021
Location
Marker shows the centre of Addison County; the queue data does not give exact sites.
Other requests in Addison County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem