United States βΊ Grid βΊ Interconnection queues βΊ Vermont
SOLAR Β· ISO-NESolar
Solar is a 20.1 MW solar request withdrawn in the ISO-NE interconnection queue, in Orange County, Vermont.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2017 (completed)
- Withdrawn / abandonedJul 2017 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 645
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- GMP Randolph Center Substation 46 kV
- Location
- Orange County, Vermont
- Technology
- Solar: 20.1 MW
- Total requested
- 20.1 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 28 April 2017
- Proposed online date
- December 2019
- Withdrawn
- July 2017
Location
Marker shows the centre of Orange County; the queue data does not give exact sites.
Other requests in Orange County
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem