Before a new power plant or battery can connect to the US grid, it joins a queue for studies and an interconnection agreement. Most requests never get built. This shows every request: active, built and withdrawn.
Map
Requests
| Project | Capacity | Status |
|---|---|---|
| RE Avalon Solar Solar · Recurrent Energy |
105 MW | Withdrawn / abandoned |
| Upton Solar Solar · Clearway Energy |
105 MW | Withdrawn / abandoned |
| Cycle Storage Battery storage · Grenergy USA |
105 MW | Withdrawn / abandoned |
| Aggie Energy storage Battery storage · KINGFISHER ENERGY STORAGE LLC |
104 MW | Withdrawn / abandoned |
| Juanita Hill Storage Other · KCE TX 20, LLC |
104 MW | Withdrawn / abandoned |
| swoose BESS III Battery storage · Tempus power management LLC |
104 MW | Withdrawn / abandoned |
| Brackens BESS Battery storage · Brackens BESS |
104 MW | Withdrawn / abandoned |
| Hive Hollows Storage Other · KCE TX 27, LLC |
104 MW | Withdrawn / abandoned |
| Equinox Storage Battery storage · Invenergy Storage Development LLC |
103 MW | Withdrawn / abandoned |
| Cone Mountain Batt Other · Ramsay Draw LLC |
103 MW | Withdrawn / abandoned |
| Highline BESS Battery storage · Highline BESS |
103 MW | Withdrawn / abandoned |
| Papley Storage Battery storage · Papley Storage, LLC |
103 MW | Withdrawn / abandoned |
| Ghost Town Storage 2 Other · Ghost Town Storage 2 LLC |
103 MW | Withdrawn / abandoned |
| Ghost Town Storage 1 Other · Ghost Town Storage 1 LLC |
103 MW | Withdrawn / abandoned |
| Bluewind Energy Center Battery storage · Bluewind Energy Center, LLC |
103 MW | Withdrawn / abandoned |
| Prickly Pear Solar · EnergieKontor US TEXAS SP 13 LLC |
103 MW | Withdrawn / abandoned |
| Burgundy BESS Battery storage · Burgundy BESS, LLC |
103 MW | Withdrawn / abandoned |
| Estonian 2 Solar Solar |
102 MW | Withdrawn / abandoned |
| Estonian Solar Solar · 249RD 8ME |
102 MW | Withdrawn / abandoned |
| Estonian 2 Solar Solar · 249RD 8ME |
102 MW | Withdrawn / abandoned |
| Deer BESS Battery storage · GRS BESS Texas Two |
102 MW | Withdrawn / abandoned |
| North Leona BESS Battery storage · Orion US Land Holding Co LLC |
102 MW | Withdrawn / abandoned |
| Horse Wrangler Storage Battery storage · Horse Wrangler Solar Project, LLC |
102 MW | Withdrawn / abandoned |
| Pecos Solar II Solar · Duke Energy |
102 MW | Withdrawn / abandoned |
| Red Mud Creek II Onshore wind · Eon |
102 MW | Withdrawn / abandoned |
| Keechi Wind Energy Center 345 kV Onshore wind · Keechi Wind, LLC |
102 MW | Withdrawn / abandoned |
| Perry Creek Solar SLF Solar · Perry Creek Solar, LLC |
102 MW | Withdrawn / abandoned |
| White Wing II Energy Storage Other · White Wing II Energy Storage LLC |
102 MW | Withdrawn / abandoned |
| White Wing I Energy Storage Other · White Wing I Energy Storage LLC |
102 MW | Withdrawn / abandoned |
| Ocee Creek Solar Solar · OCI LoneSun LLC |
102 MW | Withdrawn / abandoned |
| Callisto II Energy Center Other · Saracen II Energy Storage LLC |
102 MW | Withdrawn / abandoned |
| Kaiser Creek Wind Onshore wind · Calpine |
102 MW | Withdrawn / abandoned |
| Bottom Grass BESS MW Increase Other · Bottom Grass Solar Project, LLC |
101 MW | Withdrawn / abandoned |
| Hanson Storage Battery storage · Hanson Solar, LLC |
101 MW | Withdrawn / abandoned |
| Crowded Star I BESS Other · Jones City Solar, LLC |
101 MW | Withdrawn / abandoned |
| Parthenon Energy Battery storage · Parthenon Energy, LLC |
101 MW | Withdrawn / abandoned |
| Palacios Bay Energy Storage Battery storage · Palacios Bay Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Silver Fox Solar Solar · Industrial Lima Project LLC |
101 MW | Withdrawn / abandoned |
| Palm Bluff Energy Storage Other · Palm Bluff Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| McCook Energy Storage Other · McCook Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Antoninus Energy Storage Battery storage · Antoninus Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Port City Energy Storage Battery storage · Port City Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Ambrose Energy Storage Other · Ambrose Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Nerva Energy Storage Battery storage · Nerva Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Pelton Lake Energy Storage Other · Pelton Lake Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Canyonland Energy Storage Other · Canyonland Energy Storage, LLC |
101 MW | Withdrawn / abandoned |
| Grace Bear Solar Solar · Industrial India Project LLC |
101 MW | Withdrawn / abandoned |
| Albatross Solar Solar · Albatross Solar, LLC |
101 MW | Withdrawn / abandoned |
| Payne Mountain 138 kV Onshore wind · Sour Lake Oil and Gas, LLC |
101 MW | Withdrawn / abandoned |
| Payne Mt Wind Onshore wind · Sour Lake Oil and Gas |
101 MW | Withdrawn / abandoned |
Capacity in the queue by state
Click a state to drill down.
By grid region
ISO/RTO markets and the non-ISO West and Southeast.
- West (non-ISO utilities)5,277 · 949.5 GW
- PJM (Mid-Atlantic, Midwest)5,226 · 638.1 GW
- MISO (Midcontinent)3,261 · 621.9 GW
- CAISO (California)2,186 · 619.9 GW
- Southeast (non-ISO utilities)2,738 · 603.3 GW
- SPP (Southwest Power Pool)1,846 · 382.9 GW
- NYISO (New York)1,531 · 324.1 GW
- ERCOT (Texas)1,158 · 262.0 GW
- ISO-NE (New England)982 · 118.1 GW
Requests by year joined
Capacity of requests in this view, by the year they entered the queue. Click a year.
Source: Rand, J. et al., Queued Up, Lawrence Berkeley National Laboratory, data through end of 2025. Compiled from the queues of the 7 ISO/RTOs and dozens of non-ISO utilities. A request is a proposal to connect, not a commitment to build: historically most are withdrawn. Capacity is the requested interconnection size; hybrids include the storage component. Transmission lines · Planned power plants (EIA)