United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Upton Solar

Upton Solar is a 105 MW solar request withdrawn in the ERCOT interconnection queue, in Upton County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2015 (completed)
  2. Withdrawn / abandonedMar 2021 (project stopped here)
  3. ConsentedDec 2015 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
16INR0114
Grid region
ERCOT (Texas)
Developer
Clearway Energy
Connection point (POI)
76020 SONNE 138-kV
Location
Upton County, Texas
Technology
Solar: 105 MW
Total requested
105 MW
Study phase
IA and FIS Pending
Queue status
Withdrawn
Entered queue
26 May 2015
Agreement signed
4 December 2015
Proposed online date
November 2021
Withdrawn
March 2021

Location

Marker shows the centre of Upton County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Upton County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem