United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTUpton Solar
Upton Solar is a 105 MW solar request withdrawn in the ERCOT interconnection queue, in Upton County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2015 (completed)
- Withdrawn / abandonedMar 2021 (project stopped here)
- ConsentedDec 2015 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 16INR0114
- Grid region
- ERCOT (Texas)
- Developer
- Clearway Energy
- Connection point (POI)
- 76020 SONNE 138-kV
- Location
- Upton County, Texas
- Technology
- Solar: 105 MW
- Total requested
- 105 MW
- Study phase
- IA and FIS Pending
- Queue status
- Withdrawn
- Entered queue
- 26 May 2015
- Agreement signed
- 4 December 2015
- Proposed online date
- November 2021
- Withdrawn
- March 2021
Location
Marker shows the centre of Upton County; the queue data does not give exact sites.
Other requests in Upton County
- McCamey's Castle BatteryBattery storage Β· 410 MW Β· agreement signed
- Larkspur Energy StorageBattery storage Β· 308 MW Β· agreement signed
- Grandfalls SolarSolar + storage Β· 176 MW Β· agreement signed
- West Royal Natural Gas (TEF-Due Diligence)Gas Β· 888 MW Β· in study
- Shadow Ranch SolarSolar Β· 808 MW Β· in study
- Tres Rios Ranch SolarSolar + storage Β· 508 MW Β· in study
- WindeckerOnshore wind Β· 420 MW Β· in study
- BRP Aras BESSBattery storage Β· 304 MW Β· in study
- Badger SolarSolar + storage Β· 302 MW Β· in study
- Vista Bluff Wind II "Alternate POI"Onshore wind Β· 290 MW Β· in study
- Vista Bluff Wind I "Alternate POI"Onshore wind Β· 290 MW Β· in study
- Tres Rios Ranch BESSSolar + storage Β· 290 MW Β· in study
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem