Palm Bluff Energy Storage is a 101 MW other request withdrawn in the ERCOT interconnection queue, in Erath County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedApr 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0540
- Grid region
- ERCOT (Texas)
- Developer
- Palm Bluff Energy Storage, LLC
- Connection point (POI)
- 138kV tap on Dublin1_8 #1636 to Stphnvil_8 #1641 transmission line.
- Location
- Erath County, Texas
- Technology
- Other: 101 MW
- Total requested
- 101 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 12 October 2023
- Proposed online date
- April 2027
- Withdrawn
- April 2024
Location
Marker shows the centre of Erath County; the queue data does not give exact sites.
Other requests in Erath County
- McCrae Energy StorageBattery storage Β· 306 MW Β· agreement signed
- Erath County SolarSolar Β· 207 MW Β· agreement signed
- Glory Bee SolarSolar + storage Β· 305 MW Β· in study
- Field Marshal StorageBattery storage Β· 151 MW Β· in study
- Glory Bee StorageSolar + storage Β· 101 MW Β· in study
- Lucky Bluff BESS SLFBattery storage Β· 101 MW Β· built
- Ambrose Energy StorageOther Β· 101 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem