United States › Grid › Interconnection queues › Texas
BATTERY STORAGE · ERCOTLucky Bluff BESS SLF
Lucky Bluff BESS SLF is a 101 MW battery storage request built and operating in the ERCOT interconnection queue, in Erath County, Texas.
Request details
- Queue ID
- 24INR0295
- Grid region
- ERCOT (Texas)
- Developer
- Lucky Bluff BESS LLC
- Connection point (POI)
- 1652 Fullhouse 138kV tapped in 138kV 1641 Stephenville - 1636 Dublin
- Location
- Erath County, Texas
- Technology
- Battery: 101 MW
- Total requested
- 101 MW
- Study phase
- IA
- Queue status
- Operational
- Entered queue
- 29 March 2022
- Agreement signed
- 8 November 2023
- Proposed online date
- November 2025
- Came online
- December 2025
Location
Marker shows the centre of Erath County; the queue data does not give exact sites.
Other requests in Erath County
- McCrae Energy StorageBattery storage · 306 MW · agreement signed
- Erath County SolarSolar · 207 MW · agreement signed
- Glory Bee SolarSolar + storage · 305 MW · in study
- Field Marshal StorageBattery storage · 151 MW · in study
- Glory Bee StorageSolar + storage · 101 MW · in study
- Palm Bluff Energy StorageOther · 101 MW · withdrawn
- Ambrose Energy StorageOther · 101 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem