United States βΊ Grid βΊ Interconnection queues βΊ Texas
OTHER Β· ERCOTAmbrose Energy Storage
Ambrose Energy Storage is a 101 MW other request withdrawn in the ERCOT interconnection queue, in Erath County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedDec 2023 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0563
- Grid region
- ERCOT (Texas)
- Developer
- Ambrose Energy Storage, LLC
- Connection point (POI)
- Tap 345kV 68060 Romney - 68070 Kopperl
- Location
- Erath County, Texas
- Technology
- Other: 101 MW
- Total requested
- 101 MW
- Study phase
- FIS & SS Incomplete
- Queue status
- Withdrawn
- Entered queue
- 24 October 2023
- Proposed online date
- September 2025
- Withdrawn
- December 2023
Location
Marker shows the centre of Erath County; the queue data does not give exact sites.
Other requests in Erath County
- McCrae Energy StorageBattery storage Β· 306 MW Β· agreement signed
- Erath County SolarSolar Β· 207 MW Β· agreement signed
- Glory Bee SolarSolar + storage Β· 305 MW Β· in study
- Field Marshal StorageBattery storage Β· 151 MW Β· in study
- Glory Bee StorageSolar + storage Β· 101 MW Β· in study
- Lucky Bluff BESS SLFBattery storage Β· 101 MW Β· built
- Palm Bluff Energy StorageOther Β· 101 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem