πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues

SOLAR Β· ERCOT

Perry Creek Solar SLF

Perry Creek Solar SLF is a 102 MW solar request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Dec 2022 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
26INR0030
Grid region
ERCOT (Texas)
Developer
Perry Creek Solar, LLC
Connection point (POI)
345kV Navarro (#68091) to Limestone (# 46020)
Technology
Solar: 102 MW
Total requested
102 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
7 December 2022
Proposed online date
March 2027

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem