United States β€Ί Grid β€Ί Interconnection queues

BATTERY STORAGE Β· ERCOT

Antoninus Energy Storage

Antoninus Energy Storage is a 101 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2023 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0589
Grid region
ERCOT (Texas)
Developer
Antoninus Energy Storage, LLC
Connection point (POI)
Tap 138kV #43190 S_LANE_B138 - #42985 DYANN_POI_8 Transmission Line.
Technology
Battery: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
28 June 2023
Proposed online date
December 2028

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem