BATTERY STORAGE · ERCOTBluewind Energy Center
Bluewind Energy Center is a 103 MW battery storage request withdrawn in the ERCOT interconnection queue, in Atascosa County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Feb 2024 (completed)
- Withdrawn / abandonedApr 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 27INR0106
- Grid region
- ERCOT (Texas)
- Developer
- Bluewind Energy Center, LLC
- Connection point (POI)
- 5713 Oaks Substation 138kV
- Location
- Atascosa County, Texas
- Technology
- Battery: 103 MW
- Total requested
- 103 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 26 February 2024
- Proposed online date
- July 2026
- Withdrawn
- April 2025
Location
Marker shows the centre of Atascosa County; the queue data does not give exact sites.
Other requests in Atascosa County
- Grandslam SolarSolar · 122 MW · agreement signed
- Paradiso BESSBattery storage · 101 MW · agreement signed
- Poteet BESSBattery storage · 10.0 MW · agreement signed
- Bluewind BESSBattery storage · 247 MW · in study
- Amphion Solar Phase 2Solar · 206 MW · in study
- Amphion Solar Phase 1Solar · 181 MW · in study
- Great Hambino BESSBattery storage · 123 MW · in study
- Amphion Solar Phase 3Solar · 115 MW · in study
- Reis SolarSolar · 106 MW · in study
- Kurtz Solar SLFSolar + storage · 102 MW · in study
- Strawberry Dunes Solar SLFSolar + storage · 101 MW · in study
- Pleasanton BESSOther · 10.0 MW · suspended
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem