BATTERY STORAGE Β· ERCOT

Parthenon Energy

Parthenon Energy is a 101 MW battery storage request withdrawn in the ERCOT interconnection queue, in Hidalgo County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2023 (completed)
  2. Withdrawn / abandonedNov 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
24INR0558
Grid region
ERCOT (Texas)
Developer
Parthenon Energy, LLC
Connection point (POI)
Tap 138kV 88380 RGTAP4A - 8896 RACHAL4A
Location
Hidalgo County, Texas
Technology
Battery: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
18 April 2023
Proposed online date
December 2028
Withdrawn
November 2025

Location

Marker shows the centre of Hidalgo County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Hidalgo County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem