SOLAR Β· ERCOT

Grace Bear Solar

Grace Bear Solar is a 101 MW solar request withdrawn in the ERCOT interconnection queue, in Williamson County, Texas.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedApr 2023 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0315
Grid region
ERCOT (Texas)
Developer
Industrial India Project LLC
Connection point (POI)
Pintail 138kV, PINTAIL_8 Bus#3692
Location
Williamson County, Texas
Technology
Solar: 101 MW
Total requested
101 MW
Study phase
FIS & SS Incomplete
Queue status
Withdrawn
Proposed online date
May 2026
Withdrawn
April 2023

Location

Marker shows the centre of Williamson County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Williamson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem