United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTKirkwall Solar
Kirkwall Solar is a 73.1 MW solar request withdrawn in the ERCOT interconnection queue, in Williamson County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2020 (completed)
- Withdrawn / abandonedApr 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 22INR0439
- Grid region
- ERCOT (Texas)
- Developer
- ABEI ENERGY
- Connection point (POI)
- tap 138kV 3659 Thorndale - 3658 Taylor
- Location
- Williamson County, Texas
- Technology
- Solar: 73.1 MW
- Total requested
- 73.1 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 4 November 2020
- Proposed online date
- December 2023
- Withdrawn
- April 2022
Location
Marker shows the centre of Williamson County; the queue data does not give exact sites.
Other requests in Williamson County
- Guinness BESSBattery storage Β· 101 MW Β· in study
- Cornwall SolarSolar Β· 205 MW Β· suspended
- Cornwall BESSBattery storage Β· 204 MW Β· suspended
- North Fork Energy StorageOther Β· 101 MW Β· built
- River Valley Storage 2Other Β· 51.5 MW Β· built
- River Valley Storage 1Other Β· 51.5 MW Β· built
- Grace Bear SolarSolar Β· 101 MW Β· withdrawn
- Garnet SolarSolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem