BATTERY STORAGE Β· ERCOT

Equinox Storage

Equinox Storage is a 103 MW battery storage request withdrawn in the ERCOT interconnection queue.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jun 2020 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
23INR0048
Grid region
ERCOT (Texas)
Developer
Invenergy Storage Development LLC
Connection point (POI)
80355 Del Sol 345kV
Technology
Battery: 103 MW
Total requested
103 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
26 June 2020
Proposed online date
February 2029

Location

No county location in the queue data.

Power plants in Β· Transmission lines in

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem