United States βΊ Grid βΊ Interconnection queues βΊ Texas
SOLAR Β· ERCOTSilver Fox Solar
Silver Fox Solar is a 101 MW solar request withdrawn in the ERCOT interconnection queue, in Grayson County, Texas.
Queue statusWithdrawn / abandoned
- PlanningQueued Jul 2023 (completed)
- Withdrawn / abandonedFeb 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 25INR0318
- Grid region
- ERCOT (Texas)
- Developer
- Industrial Lima Project LLC
- Connection point (POI)
- 12677 Haggerty Switch 138kV
- Location
- Grayson County, Texas
- Technology
- Solar: 101 MW
- Total requested
- 101 MW
- Study phase
- FIS
- Queue status
- Withdrawn
- Entered queue
- 30 July 2023
- Proposed online date
- May 2026
- Withdrawn
- February 2025
Location
Marker shows the centre of Grayson County; the queue data does not give exact sites.
Other requests in Grayson County
- RAYBURN ENERGY STATION II Gas (TEF-Due Diligence)Gas Β· 570 MW Β· in study
- White Bright BESSBattery storage Β· 314 MW Β· in study
- Whitewright Solar 2Solar Β· 302 MW Β· in study
- Maddox SolarSolar Β· 101 MW Β· in study
- Prairie Point WindOnshore wind Β· 200 MW Β· withdrawn
- Prairie Point BatteryOther Β· 41.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem