United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

SOLAR Β· ERCOT

Silver Fox Solar

Silver Fox Solar is a 101 MW solar request withdrawn in the ERCOT interconnection queue, in Grayson County, Texas.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2023 (completed)
  2. Withdrawn / abandonedFeb 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
25INR0318
Grid region
ERCOT (Texas)
Developer
Industrial Lima Project LLC
Connection point (POI)
12677 Haggerty Switch 138kV
Location
Grayson County, Texas
Technology
Solar: 101 MW
Total requested
101 MW
Study phase
FIS
Queue status
Withdrawn
Entered queue
30 July 2023
Proposed online date
May 2026
Withdrawn
February 2025

Location

Marker shows the centre of Grayson County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Grayson County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem