United States › Grid › Interconnection queues › Texas
SOLAR · ERCOTWhitewright Solar 2
Whitewright Solar 2 is a 302 MW solar request in interconnection study in the ERCOT interconnection queue, in Grayson County, Texas.
Queue statusIn planning
- PlanningQueued Dec 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget May 2028 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- 26INR0300
- Grid region
- ERCOT (Texas)
- Developer
- SunWR, LLC
- Connection point (POI)
- Tap 345kV 1729 Valley South – Anna Switch 2373
- Location
- Grayson County, Texas
- Technology
- Solar: 302 MW
- Total requested
- 302 MW
- Study phase
- SS Completed, FIS Started, No IA
- Queue status
- Active
- Entered queue
- 18 December 2023
- Proposed online date
- May 2028
Location
Marker shows the centre of Grayson County; the queue data does not give exact sites.
Other requests in Grayson County
- RAYBURN ENERGY STATION II Gas (TEF-Due Diligence)Gas · 570 MW · in study
- White Bright BESSBattery storage · 314 MW · in study
- Maddox SolarSolar · 101 MW · in study
- Prairie Point WindOnshore wind · 200 MW · withdrawn
- Silver Fox SolarSolar · 101 MW · withdrawn
- Prairie Point BatteryOther · 41.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem